Saturday, November 30, 2013

November Progress/Finish

Happy Thanksgiving and end of November ! I cooked my Thanksgiving meal today. With me working in the Emergency Room, and my husband and both his brothers working public safety jobs on Thanksgiving, we get together whenever we can for dinner. And I cook.

I'm exhausted, but I need to report my November finish with SewBittersweetDesigns.

I'm not sure I really had a completion for November.

I finished two quilt tops (Swoon and fire station quilt).

I finished the backing and layering and basting the Swoon quilt. I have started quilting it....starting with stabilization by stitching in the ditch. It's the biggest quilt I have nearly finished...ever! My hubby insisted that I use a double layer of batting. So this quilt is big and heavy, and with less than 7" of machine arm space on my little Bernina, it's extremely difficult to fit and maneuver, even with a lot of table space.



These are my attempts to scrunch and roll the big quilt. It take more time to keep adjusting and wiggling the quilt than it does to actually stitch the seam!

If you're wondering what those little blue blobs are on top of the quilt, those are my Fons and Porter machine quilting gloves. They are great!


No comments:

Post a Comment